Skip to content
Restoration AnswersHome water & mold emergencies

Water damage restoration cost, city by city

By Sam Arora, Founder & Editor Β· Written with reference to IICRC S500 / III / FEMA guidance Β· Updated July 2026

Restoration is priced locally β€” labour rates, how far the nearest equipment sits, and how often the area floods all move the number. Below is every metro we currently cover, grouped by state, with the figures that city's own page publishes. 91 cities and counting.

How to read these numbers β€” before you compare anything

Every row starts from the same two national published ranges: $3.50–$7.50 per square foot (HomeGuide) for drying, $20–$37 per square foot for the rebuild, and $1,300–$5,600 for a typical job. The only thing that differs between two rows is a single cost factor.

That factor is our own editorial estimate, not a published index. It is authored at roughly state granularity and rounded to two decimals, which means the 91 cities below resolve to only 31 distinct factors β€” so cities sharing a factor print byte-identical figures, in different states. It runs from Γ—0.85 (Jackson, MS) to Γ—1.24 (New Haven, CT). Treat the national ranges as sourced, the local ones as our arithmetic, and an on-site quote as the only real number.

Not sure what you are dealing with yet? Start with the first 60 minutes checklist or run the cost calculator.

Alabama

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Huntsville, AL$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90
Mobile, AL$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90
Montgomery, AL$1,140–$4,930$3.08–$6.60$18–$33Γ—0.88

Arizona

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Mesa, AZ$1,290–$5,540$3.46–$7.42$20–$37Γ—0.99
Tucson, AZ$1,270–$5,490$3.43–$7.35$20–$36Γ—0.98

Arkansas

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Fayetteville, AR$1,140–$4,930$3.08–$6.60$18–$33Γ—0.88
Fort Smith, AR$1,120–$4,820$3.01–$6.45$17–$32Γ—0.86

California

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Bakersfield, CA$1,480–$6,380$3.99–$8.55$23–$42Γ—1.14
Fresno, CA$1,490–$6,440$4.02–$8.63$23–$43Γ—1.15
Santa Rosa, CA$1,590–$6,830$4.27–$9.15$24–$45Γ—1.22
Stockton, CA$1,510–$6,500$4.06–$8.70$23–$43Γ—1.16

Colorado

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Colorado Springs, CO$1,330–$5,710$3.57–$7.65$20–$38Γ—1.02
Fort Collins, CO$1,340–$5,770$3.60–$7.73$21–$38Γ—1.03
Pueblo, CO$1,260–$5,430$3.40–$7.27$19–$36Γ—0.97

Connecticut

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
New Haven, CT$1,610–$6,940$4.34–$9.30$25–$46Γ—1.24

Georgia

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Augusta, GA$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90
Columbus, GA$1,160–$4,980$3.12–$6.67$18–$33Γ—0.89
Macon, GA$1,140–$4,930$3.08–$6.60$18–$33Γ—0.88
Savannah, GA$1,240–$5,320$3.32–$7.13$19–$35Γ—0.95

Idaho

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Boise, ID$1,270–$5,490$3.43–$7.35$20–$36Γ—0.98
Idaho Falls, ID$1,240–$5,320$3.32–$7.13$19–$35Γ—0.95

Illinois

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Peoria, IL$1,250–$5,380$3.36–$7.20$19–$36Γ—0.96
Rockford, IL$1,250–$5,380$3.36–$7.20$19–$36Γ—0.96
Springfield, IL$1,240–$5,320$3.32–$7.13$19–$35Γ—0.95

Indiana

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Evansville, IN$1,200–$5,150$3.22–$6.90$18–$34Γ—0.92
Fort Wayne, IN$1,200–$5,150$3.22–$6.90$18–$34Γ—0.92
South Bend, IN$1,200–$5,150$3.22–$6.90$18–$34Γ—0.92

Iowa

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Cedar Rapids, IA$1,210–$5,210$3.26–$6.98$19–$34Γ—0.93
Davenport, IA$1,210–$5,210$3.26–$6.98$19–$34Γ—0.93
Des Moines, IA$1,220–$5,260$3.29–$7.05$19–$35Γ—0.94

Kansas

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Topeka, KS$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90
Wichita, KS$1,160–$4,980$3.12–$6.67$18–$33Γ—0.89

Kentucky

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Bowling Green, KY$1,180–$5,100$3.19–$6.83$18–$34Γ—0.91
Lexington, KY$1,210–$5,210$3.26–$6.98$19–$34Γ—0.93

Louisiana

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Lafayette, LA$1,200–$5,150$3.22–$6.90$18–$34Γ—0.92
Lake Charles, LA$1,200–$5,150$3.22–$6.90$18–$34Γ—0.92
Shreveport, LA$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90

Massachusetts

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Springfield, MA$1,510–$6,500$4.06–$8.70$23–$43Γ—1.16
Worcester, MA$1,560–$6,720$4.20–$9.00$24–$44Γ—1.20

Michigan

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Ann Arbor, MI$1,330–$5,710$3.57–$7.65$20–$38Γ—1.02
Flint, MI$1,240–$5,320$3.32–$7.13$19–$35Γ—0.95
Grand Rapids, MI$1,260–$5,430$3.40–$7.27$19–$36Γ—0.97
Lansing, MI$1,250–$5,380$3.36–$7.20$19–$36Γ—0.96

Mississippi

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Biloxi, MS$1,140–$4,930$3.08–$6.60$18–$33Γ—0.88
Gulfport, MS$1,140–$4,930$3.08–$6.60$18–$33Γ—0.88
Hattiesburg, MS$1,110–$4,760$2.98–$6.38$17–$31Γ—0.85
Jackson, MS$1,110–$4,760$2.98–$6.38$17–$31Γ—0.85

Missouri

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Columbia, MO$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90
Independence, MO$1,180–$5,100$3.19–$6.83$18–$34Γ—0.91
Springfield, MO$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90

Nebraska

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Lincoln, NE$1,180–$5,100$3.19–$6.83$18–$34Γ—0.91
Omaha, NE$1,200–$5,150$3.22–$6.90$18–$34Γ—0.92

Nevada

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Henderson, NV$1,330–$5,710$3.57–$7.65$20–$38Γ—1.02
Reno, NV$1,350–$5,820$3.64–$7.80$21–$38Γ—1.04

New Jersey

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Camden, NJ$1,400–$6,050$3.78–$8.10$22–$40Γ—1.08
Cherry Hill, NJ$1,430–$6,160$3.85–$8.25$22–$41Γ—1.10
Toms River, NJ$1,400–$6,050$3.78–$8.10$22–$40Γ—1.08

New Mexico

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Albuquerque, NM$1,250–$5,380$3.36–$7.20$19–$36Γ—0.96
Las Cruces, NM$1,220–$5,260$3.29–$7.05$19–$35Γ—0.94

New York

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Albany, NY$1,480–$6,380$3.99–$8.55$23–$42Γ—1.14
Syracuse, NY$1,460–$6,270$3.92–$8.40$22–$41Γ—1.12

North Carolina

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Fayetteville, NC$1,260–$5,430$3.40–$7.27$19–$36Γ—0.97

Ohio

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Akron, OH$1,240–$5,320$3.32–$7.13$19–$35Γ—0.95
Canton, OH$1,220–$5,260$3.29–$7.05$19–$35Γ—0.94
Dayton, OH$1,220–$5,260$3.29–$7.05$19–$35Γ—0.94
Toledo, OH$1,220–$5,260$3.29–$7.05$19–$35Γ—0.94

Oklahoma

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Lawton, OK$1,120–$4,820$3.01–$6.45$17–$32Γ—0.86
Tulsa, OK$1,140–$4,930$3.08–$6.60$18–$33Γ—0.88

Oregon

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Eugene, OR$1,370–$5,880$3.68–$7.88$21–$39Γ—1.05
Salem, OR$1,380–$5,940$3.71–$7.95$21–$39Γ—1.06

Pennsylvania

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Erie, PA$1,330–$5,710$3.57–$7.65$20–$38Γ—1.02
Johnstown, PA$1,300–$5,600$3.50–$7.50$20–$37Γ—1.00
Pittsburgh, PA$1,300–$5,600$3.50–$7.50$20–$37Γ—1.00

Tennessee

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Chattanooga, TN$1,200–$5,150$3.22–$6.90$18–$34Γ—0.92
Clarksville, TN$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90
Knoxville, TN$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90

Texas

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Beaumont, TX$1,200–$5,150$3.22–$6.90$18–$34Γ—0.92
Brownsville, TX$1,130–$4,870$3.04–$6.53$17–$32Γ—0.87
Corpus Christi, TX$1,200–$5,150$3.22–$6.90$18–$34Γ—0.92
Killeen, TX$1,160–$4,980$3.12–$6.67$18–$33Γ—0.89
McAllen, TX$1,140–$4,930$3.08–$6.60$18–$33Γ—0.88
Tyler, TX$1,140–$4,930$3.08–$6.60$18–$33Γ—0.88
Waco, TX$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90

Utah

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Ogden, UT$1,270–$5,490$3.43–$7.35$20–$36Γ—0.98
Provo, UT$1,290–$5,540$3.46–$7.42$20–$37Γ—0.99

Virginia

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Lynchburg, VA$1,290–$5,540$3.46–$7.42$20–$37Γ—0.99
Roanoke, VA$1,310–$5,660$3.54–$7.58$20–$37Γ—1.01

Washington

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Spokane, WA$1,370–$5,880$3.68–$7.88$21–$39Γ—1.05
Tacoma, WA$1,460–$6,270$3.92–$8.40$22–$41Γ—1.12

West Virginia

CityTypical jobDrying $/sq ftRebuild $/sq ftFactor
Charleston, WV$1,180–$5,100$3.19–$6.83$18–$34Γ—0.91
Huntington, WV$1,170–$5,040$3.15–$6.75$18–$33Γ—0.90

This is general information, not insurance, legal, or engineering advice. Estimates are planning ranges, not quotes β€” always get on-site assessments, and confirm coverage against your own policy wording or with your insurer.

πŸ’§ Water emergency? Tap for what to do β†’